ICS 91.140.30 CCS P 45/49 备案号: J2133—2016 中国电力企业联合会标准 P T/CEC 5082—2022 区域供冷站工程调试试运导则 Guidelines for commissioning and trial operation of regional cooling station projects 2022-10-26 发布 2023-02-01 实施 中国电力企业联合会 发布 T/CEC 《电子编加稿件》 XM95136 责编:马雪倩 成品: 140*203 责校:王海南 版心: 104*160 字数: 28*29行 天25 地 18 订 19 切 17 无图 全国团体标准信息平台10mm 10mm 21mm T/CEC 5082—2022 定价:72.00 元  全国团体标准信息平台 中国电力企业联合会标准 区域供冷站工程调试试运导则 Guidelines for commissioning and trial operation of regional cooling station projects T/CEC 5082—2022 主编机构: 中国电力企业联合会 批准机构: 中国电力企业联合会 施行日期: 2023年2月1日 中国电力出版社 2023 北 京 全国团体标准信息平台 中国电力企业联合会标准 区域供冷站工程调试试运导则 Guidelines for commissioning and trial operation of regional cooli ng station projects T/CEC 5082—2022 * 中国电力出版社出版、印刷、发行 (北京市东城区北京站西街 19号 100005 http://www.cepp.sgcc.com.cn ) * 2023年9月第一版 2023年9月北京第一次印刷 850毫米× 1168毫米 32开本 3.5印张 93千字 * 统一书号 155198·4896 定 价72.00元 版 权 专 有 侵 权 必 究 本书如有印装质量问题,我社营销中心负责退换 全国团体标准信息平台T/CEC 5082—2022 I 前 言 根据《关于印发 2019年第一批中国电力企业联合会标准制订 计划的通知》 (中电联标准〔 2019〕86 号)和《工程建设标准编 写规定》(建标〔 2008〕182号)的要求,导则编制组根据区域供 冷站实践经验,经广泛调查研究,并在广泛征求意见的基础上,制定本导则。 本导则的主要技术内容包括:总则、术语、基本规定、调试 试运准备、制冷系统调试、冷冻水系统调试、热水系统调试、暖通空调系统调试、整套系统试运、系统交接验收及考核期。 本导则由中国电力企业联合会电力供热标准化技术委员会 (CEC/TC 11 )提出并归口。 本导则主要起草单位:珠海横琴能源发展有限公司 大唐东北电力试验研究院有限公司 华信创(北京)认证中心有限公司 本导则主要起草人:梁凤岗 徐朝阳 严 琨 胡为森 韩 宇 波 曾贺湛 欧志才 唐 伟 刘 磊 韦廷才 黄长根 杨 哲 董 斌 王 林 郑质凡 包可心 卜 世 杰 秦礼鹏 赵利钧 江 斓 徐 超 张建清 焦广识 李 健 熊 萌 伍韬憬 罗 浩 吴 桐 曾 宪 龙 郭文俊 耿安然 祁渭岩 律 红 楠 苏高慧 奉 程 徐志华 孙 志 宇 刘巍栋 本导则主要审查人:王 钊 王明超 白首跃 傅建平 李 红 梅 巫术胜 天 乙 潘 安 全国团体标准信息平台T/CEC 5082—2022 II 曹 晓 雨 赵建成 李 刚 陶春明 本导则为首次发布。 本导则在执行过程中的意见或建议反馈至中国电力企业联合 会标准化管理中心(北京市白广路二条一号,100761 ) 。 全国团体标准信息平台T/CEC 5082—2022 III 目 次 1 总 则 ·····························································································1 2 术 语 ·····························································································2 3 基本规定 ·····················································································3 4 调试试运准备 ·············································································4 5 制冷系统调试 ·············································································7 6 冷冻水系统调试 ········································································21 7 热水系统调试 ···········································································33 8 暖通空调系统调试 ····································································46 9 整套系统试运 ···········································································58 10 系统交接验收及考核期 ··························································63 附录 A 调试试运记录表单 ··························································64 本导则用词说明 ·············································································99 引用标准名录 ···············································································100 附:条文说明 ···············································································101 全国团体标准信息平台T/CEC 5082—2022 IV Contents 1 General provi sions ······································································ 1 2 Terms ·························································································· 2 3 Basic requir ements······································································ 3 4 Prepare for commissioning an d trail oper ation ···························· 4 5 Refrigeration system debugg ing·················································· 7 6 Chilled water syst em debu gging ················································ 21 7 Commissioning of ho t water sy stem·········································· 33 8 Hvac system debuggin g ·························

pdf文档 T-CEC 5082—2022 区域供冷站工程调试试运导则

文档预览
中文文档 9 页 50 下载 1000 浏览 0 评论 0 收藏 3.0分
温馨提示:本文档共9页,可预览 3 页,如浏览全部内容或当前文档出现乱码,可开通会员下载原始文档
T-CEC 5082—2022 区域供冷站工程调试试运导则 第 1 页 T-CEC 5082—2022 区域供冷站工程调试试运导则 第 2 页 T-CEC 5082—2022 区域供冷站工程调试试运导则 第 3 页
下载文档到电脑,方便使用
本文档由 思安2023-09-30 10:01:24上传分享
给文档打分
您好可以输入 255 个字符
网站域名是多少( 答案:github5.com )
评论列表
  • 暂时还没有评论,期待您的金玉良言